Service
New Construction Wiring in Tukwila
Wiring for new homes, additions and ADUs, planned with your builder and inspected at each stage so the project keeps moving.
Talk through your build — (000) 000-0000
Wiring a Building From Bare Studs
New construction is where good planning pays off. Outlets where the furniture will be, switches by the doors you actually use, and enough capacity for the charger and heat pump you will want in five years. Electrician Tukwila works from your plans with you and your builder to get the layout right before the first box goes in.
We handle additions, detached garages, backyard ADUs and full new homes. That includes temporary power for the build, the permanent service, rough-in wiring, low-voltage pathways and the finish wiring once surfaces are complete.
Every stage is inspected. We book those inspections around the builder's schedule so framing, insulation and drywall crews are never left waiting on us.
Owner-builders get the same attention as contractors. If this is your first build, we explain what each inspection looks for and what you need to have ready, so the electrical side never becomes the thing that stalls the schedule.
What New Construction Wiring Includes
From temporary power to the last fixture.
Plan review
We go over the electrical plan and suggest changes that save money or add convenience.
Temporary power
A temporary service pole or panel so the trades have power from day one.
Permanent service
The service entrance, meter base and main panel sized for the finished building.
Rough-in wiring
Boxes, cable and home runs installed while the framing is open.
Low-voltage pathways
Conduit and boxes for data, TV and future upgrades.
EV and heat pump readiness
Capacity and circuits planned for the loads most new homes now add.
ADUs and additions
Subpanels and feeders for backyard units, garages and additions.
Finish wiring
Devices, fixtures and appliances connected once surfaces are done.
Staged inspections
Rough-in and final inspections booked and met by us.
How We Work With Your Builder
Plan
We review the drawings and agree the layout and the schedule. You get an itemized quote for each stage.
Rough-in
We wire the open framing when the builder is ready and pass the rough-in inspection before insulation.
Finish and final
After drywall and finishes we complete the devices and fixtures, test everything and close out the final.
Why Builders Keep Us on the Schedule
We turn up when framing is ready
Our scheduling follows the build, so other trades are not held back.
Stage-by-stage pricing
You know what each phase costs before it starts.
Future-ready layouts
We plan for chargers and heat pumps now so nobody opens walls later. A spare conduit to the garage costs little at framing and saves a lot down the line.
Building Something New?
The best time to plan the wiring is before the framing starts. Call and we will go through the drawings with you.
Go over the plans with us — (000) 000-0000Free in-home estimates.